Skip to main content
Home
About Us
Product
Contact Us
Home
About Us
Product
Contact Us
ID
EN
Calculator
How to Install AAC Block
30 April 2021
Set wall alignment using a string line.
Soak the AAC block in water until damp.
Prepare thin-bed adhesive: 9.5–10.5 liters of water per 40 kg of instant cement.
Apply adhesive 3 mm on columns, 10–20 mm on the base; install from a wall corner, level with a mallet.
Use 3 mm adhesive between blocks, check evenness with a spirit level. Let cure 24 hours.
Plastering AAC Block
Clean the wall with water before plastering.
Plaster mix: 6–6.5 liters of water per 40 kg cement, 10 mm thick.
Protect from direct sunlight with a tarp.
Let rest 2–3 weeks until shrinkage stops.
Skim-Coating AAC Block
Skim-coat mix: 13.5–14.5 liters of water per 40 kg cement, 1–3 mm thick (2 stages if 3 mm).
Use a trowel, smooth with a damp brush and cement-bag paper.
Wait until fully dry before the next stage.
Row concave Shape
Decorative svg added to bottom
Other Blog
1 September 2021
The Right Wall-Plastering Technique for Beginners
Read More
13 October 2021
Types of Heavy Equipment Used in Construction
Read More
30 April 2021
Types of Ceramic Floor Tiles
Read More